Temporary Intersection Closure – Whitevale Road and North Road Intersection 

Purpose:  Q2026-25 – Whitevale Master Drainage Plan Implementation Project   

Duration: November 16, 2026 to November 27, 2026 

The City of Pickering's contractor, Elirpa Construction & Materials Ltd., is undertaking storm sewer replacement and road reconstruction works on Whitevale Road between Altona Road and Golf Club Road (Q2026-25). As part of this project, an Oil Grit Separator (OGS) unit and a maintenance hole must be installed at the intersection of Whitevale Road and North Road.

Due to the size of these structures, the use of heavy construction equipment, and the space required to safely complete the work, the Whitevale Road/North Road intersection will be closed to all turning movements. Vehicles will not be able to turn from North Road onto Whitevale Road or from Whitevale Road onto North Road. Through traffic on Whitevale Road will be maintained; however, it will be restricted to a single lane through in the immediate work zone. 

Alternate routes will be available via North Road, Churchwin Street, Mill Street, and Gladstone Street, as shown on the attached detour map.

Appropriate traffic control measures and detour signage, will be in place and maintained throughout the duration of the work to facilitate the safe and efficient movement of vehicles, pedestrians, and emergency services.

View Service Announcement and Location Map

For additional information please contact: 

Moe Zamaani, P. Eng.  
Senior Coordinator, Capital Projects 
City Infrastructure Department  
Tel: 905.420.4660 ext. 2059 
mzamaani@pickering.ca  

Service Disruption Line: 1.866.278.9993 